Six Sigma - Green Belt level session I
Training symbol:
6S-GB I -ONL-ENG
Copied!
Estimated share of practical part:
60%
Training symbol:
6S-GB I -ONL-ENG
Copied!
Training Objectives
Preparing the participants to independently implement simple improvement projects according to the Six Sigma methodology.
The main part of the training is devoted to presentations on how to implement the different stages of a Six Sigma project and which tools to use at these stages.
While discussing the individual stages and tools, exercises are carried out using the specialized Minitab statistical package.
Training programme
Programme and exercises
PART I DAY I
1 Introduction to Six Sigma:
- What is Six Sigma?
- Examples from companies that have launched Six Sigma programmes.
- Projects as a way of making improvements.
- The concept of the ‘hidden factory’.
- How quality and performance are measured in Six Sigma (RTY).
- Poor quality costs.
- Roles and responsibilities in Six Sigma system.
- Green Belt certification conditions.
2 Fundamentals of statistics:
- The nature and causes of variability.
- Systemic and special causes of variability.
- Data types.
- Parameters of descriptive statistics.
- Charts: histogram, Dotplot, Boxpolt, ScatterPlot, Matrixplot, control charts.
- The concept of normal distribution and standard deviation.
- Calculating probability for a normal distribution.
PART I DAY II
1 Six Sigma methodology:
- DMAIC methodology.
- Identification of the company’s problems.
- Prioritisation, selection and definition of improvement projects.
2 Six Sigma project stages:
PHASE 1 – DEFINE (project)
- Preparation of a Project Charter.
- Formulating the problem and purpose of the project.
- Project scope.
- Milestones.
- SIPOC diagram.
- Defining CTQ parameters.
PART I DAY III
1 Six Sigma project stages:
PHASE 2 – MEASURE (current status)
- Transition from external CTQ to internal Y.
- Data collection plan.
- MSA – Measurement system validation (Gage R&R).
- Process stability study.
- Determining the current capacity of the process: Cp, Cpk, Pp, Ppk, DPMO, Sigma level of the process.
- Interpretation of the results.
2 Implementation of the pilot project:
- Pre-selection of pilot projects by participants, definition of Project Charter and data collection plan.
- Individual work.
BREAK FOR IMPLEMENTATION OF THE PILOT PROJECT (approx. 1 month)
Coaches
The coaching team may change
Krzysztof
Select training type
Select a training date
No available dates
Need a dedicated training for your team?
Ask about training
Successfully added to cart
Six Sigma - Green Belt level session I
Symbol: 6S-GB I -ONL-ENG
Open and closed training
Select related
Open and closed training
Planning an experiment - DOE - basic scope
Symbol: DOE-P-ONL-ENG
View training
Open and closed training
Planowanie eksperymentu – DOE - zakres zaawansowany
Symbol: DOE-Z
View training
Open and closed training
Metody analizy danych procesów produkcyjnych
Symbol: MTB-STAT
View training
Open and closed training
FMEA analysis of production processes
Symbol: PFMEA-P-ONL-ENG
View training
Open and closed training
Metody statystyczne w analizie sensorycznej - badania konsumenckie
Symbol: SNS-STAT-K
View training
Open and closed training
SPC statistical process control - basic training
Symbol: SPC-P-ONL-ENG
View trainingDo you have questions about this training?
Consult with our advisor.