Training Objectives

Training objectives
Teaching the use of the Value Stream Map (VSM) in the right way in the right processes and at the right time as a strategic tool for organisational improvement.

Programme and exercises

1. Introduction to Value Stream Mapping (VSM):

  • Essence and importance of VSM
  • 7 Lean losses
  • Flow of material and information
  • Product family selection
  • Value stream manager
  • Use of the mapping method

2. Map of the current state.

3. Creating a map of the current state:

  • Step 1. Presentation of the customer’s requirements.
  • Step 2. Presentation of the different phases of the processes.
  • Step 3. Collection and calculation of data.
  • Step 4. Presentation of the material flow.
  • Step 5. Presentation of the information flow.
  • Step 6. Presentation of the requirements for the supplier.
  • Step 7. Final calculations.

4. Slimming down the value stream:

  • Characteristics of a lean value stream.
  • Calculating and including the customer’s tact into the design.
  • Selecting the manufacturing method.
  • Selecting continuous production flow sites.
  • Introducing suction systems e.g. of the supermarket type.
  • Selection of the scheduling site (stimulating process).
  • Production in small batches and levelling.

5. Map of the future state:

  • Creating a map of the future state – an exercise.
  • Dividing implementation into stages.
  • A value stream change plan.
  • Improving the value stream.

Exercises:

  • The Muda game
  • Creating a map of the current state.
  • Carrying out the calculations necessary to map the future stream.
  • Creating a map of the future state.
  • Value stream map design for a selected product – validation exercise.

Coaches

The coaching team may change
Robert

Select training type

Select a training date

No available dates

Need a dedicated training for your team?
Ask about training
Need help?
KP
Karolina Paluch
Specjalista ds. Realizacji szkoleń
[email protected] 798 982 919

Successfully added to cart

Value stream mapping

Value stream mapping

Symbol: VSM-ONL-ENG
Open and closed training

Select related

Projektowanie layoutów
Open and closed training

Projektowanie layoutów

Symbol: LYT-P

View training
Normowanie czasu pracy - metoda chronometrażu
Closed training

Normowanie czasu pracy - metoda chronometrażu

Symbol: NCP-CHR

View training
Mistrz produkcji i brygadzista – twarde techniki i narzędzia
Open and closed training

Mistrz produkcji i brygadzista – twarde techniki i narzędzia

Symbol: STA-P

View training
Teoria ograniczeń - zarządzanie wąskimi gardłami w procesach produkcyjnych
Open and closed training

Teoria ograniczeń - zarządzanie wąskimi gardłami w procesach produkcyjnych

Symbol: TOC-P

View training

Related trainings

Mistrz produkcji i brygadzista – twarde techniki i narzędzia

Next date: 29.10.2026 - 30.10.2026 Location: Stacjonarnie
Symbol: STA-P

Teoria ograniczeń - zarządzanie wąskimi gardłami w procesach produkcyjnych

Next date: 23.11.2026 - 25.11.2026 Location: Stacjonarnie
Symbol: TOC-P
Guaranteed

Projektowanie layoutów

Next date: 04.12.2026 Location: Stacjonarnie
Symbol: LYT-P

Normowanie czasu pracy - metoda chronometrażu

Symbol: NCP-CHR

Do you have questions about this training?

Consult with our advisor.

Contact us